Determine project costs based on [[BIM Deliverable]]s rather than on the number of [[2D Drawing]]s required
https://w3id.org/bimei/statement/determine-2d-drawing-bim-deliverable-c6f2dc1d
Labels & definitions
EN
Determine project costs based on [[BIM Deliverable]]s rather than on the number of [[2D Drawing]]s required
FR
Déterminer les coûts du projet en fonction des [[livrables BIM]] plutôt que du nombre de [[dessins 2D]] nécessaires
Determine project costs based on [[BIM Deliverable]]s rather than on the number of [[2D Drawing]]s required
Opens with https://w3id.org/bimei/action/determine
Competency Topics
Signature
https://w3id.org/bimei/action/determine::https://w3id.org/bimei/term/2d-drawing|https://w3id.org/bimei/term/bim-deliverable