{"iri":"https://w3id.org/bimei/term/asset-information-model","type":"term","register":"canonical","status":"canonical","liveVersion":1,"pinned":false,"version":null,"provenance":{"sourceApp":"bimd","sourceId":"be9fa1db578af5f5","changeSource":"rule","curator":null},"labels":{"ar":{"label":"نموذج معلومات الاصل","definition":"نوع فرعي من [[نموذج المعلومات]] يدعم صيانة وإدارة وتشغيل الأصل في مختلف مراحلها. تم استخدام نموذج المعلومات الأصل (AIM) (أ) كمستودع لجميع المعلومات عن الأصل؛ (ب) كوسيلة للوصول /رابط إلى نظم المؤسسة (مثل CMMS وBMS)؛ و (ج) كوسيلة لتلقي وتركيز المعلومات من الأطراف الأخرى في جميع أنحاء مراحل المشروع"},"cs":{"label":"Informační model aktiva","definition":"Dílčí typ [[Informačních modelů]] podporující údržbu, správu a provoz aktiva skrze jeho životní cyklus. Informační model aktiva (AIM) se používá (a) jako depozitář pro veškeré informace o aktivu; (b) jako prostředek pro přístup/připojení do systémů podniku (např. CMMC a BMS); a (c) jako prostředek pro příjem a centralizaci informací od ostatních stran v průběhu fází projektu"},"en":{"label":"Asset Information Model","definition":"The [[Information Model]] relating to the operational phase of an [[Asset]], holding the information an owner or operator needs to run, maintain and make decisions about it. [[ISO 19650-1]] (5.6) describes it as supporting both strategic and day-to-day asset management, with typical contents such as equipment registers, installation and maintenance dates, cumulative maintenance costs and ownership details. Its content, structure and method are set by the [[Asset Information Requirements]]. At the end of each project, the information containers needed for asset management are handed over from the [[Project Information Model]]; during operation, maintenance and other asset management appointments add to it. Before anything is added, those responsible for asset information management validate it and authorise it, so the model holds only published or archived information. An AIM is rarely a single file or database: it is usually a set of linked containers spread across systems, such as maintenance management and building management systems, and managed through the [[Common Data Environment]]. It also works in the other direction, supplying existing asset information at the start of the next project"}},"data":{},"language":"en","label":{"label":"Asset Information Model","definition":"The [[Information Model]] relating to the operational phase of an [[Asset]], holding the information an owner or operator needs to run, maintain and make decisions about it. [[ISO 19650-1]] (5.6) describes it as supporting both strategic and day-to-day asset management, with typical contents such as equipment registers, installation and maintenance dates, cumulative maintenance costs and ownership details. Its content, structure and method are set by the [[Asset Information Requirements]]. At the end of each project, the information containers needed for asset management are handed over from the [[Project Information Model]]; during operation, maintenance and other asset management appointments add to it. Before anything is added, those responsible for asset information management validate it and authorise it, so the model holds only published or archived information. An AIM is rarely a single file or database: it is usually a set of linked containers spread across systems, such as maintenance management and building management systems, and managed through the [[Common Data Environment]]. It also works in the other direction, supplying existing asset information at the start of the next project"},"backlinks":{"referencedBy":{"total":20}}}