BIMei Ontology
Concept scheme

Topics

Version 1.0.0 approved Not the active release Contract 1.0.0

Controlled subject areas used to describe what a resource is about.

25Concepts

Scheme https://w3id.org/bimei/scheme/topics in release 0e0965c8-2144-5f34-b67b-88076a3883d4. This page is bound to that exact release, so its URL stays stable and shareable.

All 25 concepts, in canonical release order.

Concepts

  1. 01

    Asset Management

    bimei:term/asset-management

    BIM-enabled Asset Management is characterized by linking virtual objects and spaces within a model to an external database for the purpose of operating and maintaining a FacilityFacilityA physical structure or installation, including related site works, serving one or more main purpose. A Facility is defined within a single geographical boundary, organisational unit or production process [adapted from ISO 12911:2012 and ISO 14064-1:2006] or a portfolio of facilities

    BIMd Term · resolved by ONT
  2. 02

    Competence Management

    bimei:term/competence-management

    The coordinated identification, development, assessment and maintenance of the competence needed by people or organisations to perform their roles.

    BIMd Term · resolved by ONT
  3. 03

    Information Environments

    bimei:term/information-environments

    The settings and systems in which information is created, managed, exchanged, accessed and retained across an asset or project lifecycle.

    BIMd Term · resolved by ONT
  4. 04

    Information Lifecycle

    bimei:term/information-lifecycle

    The full duration that InformationInformationThe facts provided or learned about events, things, processes or concepts that has a particular meaning within a certain context [adapted from the Oxford Dictionary and ISO/IEC 2382-1:1993] is usable. The Information Lifecycle may span a single or multiple Information CycleInformation CycleA single revolution of Information along an Information Route back to the Information Milestone that it started from. For example, if an asset is reused three times, it\'s information have completed three Information Cycless. An Information Cyle is different than an Asset Life CycleAsset Life CycleRefers to all asset phases: from planning, through design, construction and use/maintenance till disposal. Asset Life Cycle phases are typically used for establishing change in asset utilization, depreciation, Life Cycle Cost, Life Cycle Expenditure, and Life Cycle Assessment as the InformationInformationThe facts provided or learned about events, things, processes or concepts that has a particular meaning within a certain context [adapted from the Oxford Dictionary and ISO/IEC 2382-1:1993] about an AssetAssetAn asset is an entity of value. In Asset Management, an asset refers to physical entities of tangible financial value similar to buildings, land, equipment, and inventory may persist even if the Asset is decommissioned, demolished, or no longer available

    BIMd Term · resolved by ONT
  5. 05

    Interoperability

    bimei:term/interoperability

    The ability of diverse systems (and organizations) to work together seamlessly without DataDataA reinterpretable representation of Information which can be collected/parsed with or without the human actor. Data is either statically embedded within Documents and Models or drive their dynamic generation/modification [Adapted from ISO/IEC 2382-1:1993] loss and without a special effort. Interoperability may refer to systems, processes, file formats, etc. Interoperability is not synonymous with openness. For example, interoperable file formats can be proprietary-closed (e.g. RVT), proprietary-open (e.g. DWF) and non-proprietary (e.g.IFC)

    BIMd Term · resolved by ONT
  6. 06

    International Standards

    bimei:term/international-standards

    Standards developed through international consensus for consistent application across countries, organisations or markets.

    BIMd Term · resolved by ONT
  7. 07

    Knowledge Management

    bimei:term/knowledge-management

    BIM-specific Knowledge Management refers to the organizational efforts to identify and collect BIM KnowledgeBIM KnowledgeBIM Knowledge is a term that describes the non-software aspects of BIM. It refers to domain-specific education, project experience and what should be known by individuals in order to generate accurate and useful BIModels. As opposed to BIM Skill which focuses on how good a softw… from staff and external sources and then to represent, store, protect and redistribute it as necessary

    BIMd Term · resolved by ONT
  8. 08

    Learning and Education

    bimei:term/learning-and-education

    A Macro Maturity ComponentMacro Maturity ComponentThe Macro Maturity Components model identifies 8 complementary components for measuring and establishing the relative and absolute BIM Maturity of Macro Organizational Scales (Market, Defined Market and Sub-Market) representing market-wide educational activities covering BIM concepts, tools and workflows. These educational activities are either delivered through tertiary education, vocational training or professional development; as competency-based or course-based learning models

    BIMd Term · resolved by ONT
  9. 09

    Macro Policy

    bimei:term/macro-policy

    High-level public or sector-wide policy that shapes the governance, adoption and use of BIM and related digital practices.

    BIMd Term · resolved by ONT
  10. 10

    Model Management

    bimei:term/model-management

    A set of activities intended to prepare or maintain a BIModelBIModelBuilding Information Model (BIModel) is the object -based, data-rich, 3D digital model generated by a Project Participant using a BIM Software Tool at a prescribed performance/quality level. Model Management includes numerous tasks to ensure that the BIModelBIModelBuilding Information Model (BIModel) is the object -based, data-rich, 3D digital model generated by a Project Participant using a BIM Software Tool: follows organization/project standards, is free from errors, is at the right Level of DevelopmentLevel of DevelopmentA BIM metric to identify what information to include in a model during the design and construction process (also refer to Model Progression Specifications). Please note that the LOD abbreviation refers to multiple terms, definitions, and numbering systems even within the same co…, etc. Refer also to Model ManagerModel ManagerAn internal organizational role; a Model Manager is typically responsible for keeping a BIModel up-to-date, free of errors and conforming to organizational standards (also refer to Project Model Manager) and Project Model ManagerProject Model ManagerA project team role; a Project Model Manager is typically responsible for keeping a project model up-to-date, free of errors and conforming to Project Team standards (also refer to Model Manager)). Model Management is a BIMe Technical CompetencyTechnical CompetencyTechnical competencies and topics cover the software tools and equipment required to generate specific Project Deliverables. Technical topics also focus on the detailed activities, tasks and steps required to deliver a service or a product. Topics include General IT, Software Sy…

    BIMd Term · resolved by ONT
  11. 11

    Hardware and Equipment

    bimei:term/hardware-and-equipment

    BIMe Topic under Technical CompetencyTechnical CompetencyTechnical competencies and topics cover the software tools and equipment required to generate specific Project Deliverables. Technical topics also focus on the detailed activities, tasks and steps required to deliver a service or a product. Topics include General IT, Software Sy…: Specifying, recommending or procuring computer hardware and equipment

    BIMd Term · resolved by ONT
  12. 12

    Performance Management

    bimei:term/performance-management

    BIMe Topic under Administration CompetencyAdministration CompetencyAdministration competencies and topics cover the day-to-day organizational activities as required to meet and maintain strategic objectives. Administration topics do not typically focus on specific projects but the sum of all projects; their human resources, procurement practice…: Assessing organizational BIM capability/maturity, Individual CompetencyIndividual CompetencyThe combined skill, knowledge and experience of an individual representing his/her ability to perform an activity or a task. In BIM Excellence, the term 'Competency' is used generically and may refer to Individual Competency, Organizational Competency or Project Team Competency and project performance using standardized metrics

    BIMd Term · resolved by ONT
  13. 13

    Process Management

    bimei:term/process-management

    The planning, coordination, monitoring and improvement of connected activities that produce an intended outcome.

    BIMd Term · resolved by ONT
  14. 14

    Procurement

    bimei:term/procurement

    The process of defining requirements and acquiring works, goods or services, including supplier selection, contracting and administration.

    BIMd Term · resolved by ONT
  15. 15

    Project Management

    bimei:term/project-management

    Project Management represents a set of activities necessary for the successful delivery of a project within specified constraints. In BIM Excellence, Project Management is a Competency TopicCompetency TopicCompetency Topics are part of Competency Sets and Competency Tiers and include thousands of Competency Items. In BIM Excellence there are 55 standards Competency Topics including Leadership, Collaboration, and Knowledge Management within the Functional CompetencyFunctional CompetencyFunctional competencies and topics cover the overall running of one or more projects by project leaders and team managers. Functional topics do not typically cover the technical specifics of every deliverable but focus on serving clients and supervising the internal process of p… set and is defined as "Managing projects where BIM WorkflowBIM WorkflowA workflow identifies major successive activities to perform, decision gates to pass-through, and delivery milestone to reach. A BIM workflow is typically part of larger BIM Processes - aimed at fulfilling strategic/operational objectives - and may include several documented Pro…s are used and Model-based DeliverableModel-based DeliverableThe output of a successful execution of a Model Use. Model-based Deliverables (e.g. Cost Estimation Report) and Model Uses (e.g. Cost Estimation) are two faces of the same coin. While Model-based Deliverables represent the output (product), Model Uses represent the Users' object…s are specified"…Also Refer to Construction ManagementConstruction ManagementThe set of activities necessary to organise the delivery of a construction project within established design, budget and time constraints. Construction Management include Cost Planning, Value Engineering and several other key activities

    BIMd Term · resolved by ONT
  16. 16

    Publications

    bimei:term/publications

    Resources issued for an audience in a stable form, including guides, protocols, reports, manuals and other reference documents.

    BIMd Term · resolved by ONT
  17. 17

    Quality Management

    bimei:term/quality-management

    Processes and systems which aim to fulfil the customer's requirements, enhance customer satisfaction, monitor against applicable QualityQualityThe measure of excellence or a state of being free from defects, deficiencies, and significant variations, brought about by the strict and consistent adherence to measurable and verifiable standards to achieve uniformity of output that satisfies specific customer or user require… standards and achieve continuous improvement. Quality Management (QM) has four main components: Quality PlanningQuality PlanningThe activities and system changes planned to improve the Quality of a product or service. Quality Planning is a components of Quality Management, Quality ControlQuality ControlThe activities conducted, or the mechanisms or techniques used to check if Quality requirements for a product or service are met. Quality Control is a components of Quality Management, Quality AssuranceQuality AssuranceThe system implemented to provide confidence that Quality requirements for a product or service are met. Quality Assurance is a components of Quality Management and Quality ImprovementQuality ImprovementThe activities conducted or systematic changes implemented to improve the Quality of a product or service so it can meet or exceed quality requirements. Quality Improvement is a components of Quality Management. Quality Management is a BIMe Administration CompetencyAdministration CompetencyAdministration competencies and topics cover the day-to-day organizational activities as required to meet and maintain strategic objectives. Administration topics do not typically focus on specific projects but the sum of all projects; their human resources, procurement practice…

    BIMd Term · resolved by ONT
  18. 18

    Roles

    bimei:term/roles

    Named functions or positions with defined responsibilities, authority or expected contributions within an activity or organisation.

    BIMd Term · resolved by ONT
  19. 19

    Software Tools

    bimei:term/software-tools

    Software applications or plugins used to perform, support, automate or assess digital construction activities.

    BIMd Term · resolved by ONT
  20. 20

    Artificial Intelligence

    bimei:term/artificial-intelligence

    Computational methods that perform tasks associated with human intelligence, including learning, reasoning, perception and language processing.

    BIMd Term · resolved by ONT
  21. 21

    Asset Coupling

    bimei:term/asset-coupling

    The development and/or maintenance of digital assets so they accurately match the physical AssetAssetAn asset is an entity of value. In Asset Management, an asset refers to physical entities of tangible financial value similar to buildings, land, equipment, and inventorys they represent. Asset Coupling translates changes in one asset (e.g. a change in the state or location of a component in real space) to changes in the coupled asset (in virtual space). Asset Coupling is applicable by Asset ScaleAsset ScaleA Built Asset of specific comparative size within a specified Asset Hierarchy. According to the BIM Framework, Asset Scales include Built Facility (e.g a university campus), Building (e.g. Administration Building within the campus), Building System (e.g. Chiller Water System wit… – components are coupled with components, systems with systems, etc. - and varies according to Coupling LevelCoupling LevelA BIMe Metric that describes the extent of connectedness between a physical Asset and its Digital Twin as a result of Asset Coupling. An elevated Coupling Level (CLevel) indicates real-time mirroring of changes, while a base level indicates a delayed or partial change. There are……Also refer to Digital TwinDigital TwinA set of digital assets – models, documents and data sets - that mirror a physical Asset for part/whole of the Asset Life Cycle. In the Construction Industry, a Digital Twin typically refers to a data-rich 3D model – of a building for example - that represents, reacts to, and ca…

    BIMd Term · resolved by ONT
  22. 22

    Re-Use

    bimei:term/re-use

    Using an existing asset, component, material, information resource or other item again, with or without limited adaptation.

    BIMd Term · resolved by ONT
  23. 23

    BIM Adoption

    bimei:term/bim-adoption

    BIM Adoption refers to either BIM ImplementationBIM ImplementationBIM implementation refers to the set of activities undertaken by an organizational unit to prepare for, deploy or improve its BIM deliverables (products) and their related workflows (processes). BIM implementation is made of three phases: BIM Readiness, BIM Capability, and BIM M…, BIM DiffusionBIM DiffusionThe spread of BIM tools, workflows and protocols within a population of adopters, whether within an organization or across a whole market, or a mixture of the two terms. Please refer to Point of AdoptionPoint of AdoptionThe Point of Adoption (PoA) marks the initial 'capability jump' from BIM Readiness or pre-BIM status to minimum BIM capability (BIM Stage 1). Secondary PoAs are also identifiable at the start of the other two BIM Stages

    BIMd Term · resolved by ONT
  24. 24

    Information Management

    bimei:term/information-management

    The collection, classification, storage and redistribution of information in digital, audio-visual or paper form. Information Management also refers to the ability of an organization to harvest and make-use of information to drive its decision-making process

    BIMd Term · resolved by ONT
  25. 25

    Classification System

    bimei:term/classification-system

    A distribution of classes or categories created according to a common relation. In construction, there are several classification systems covering elements, spaces, disciplines, materials, among others (OmniClassOmniClassOmniClass (OCCS) is a Classification System for organizing library materials, product literature and project information. OmniClass has 15 'classification tables'; some of which are incorporated from other classification systems including: MasterFormat (a classification for 'wor… is an example of a widely used classification system)

    BIMd Term · resolved by ONT

Machine representations

The same scheme as SKOS, scoped to this release: JSON-LD · Turtle · release metadata.